Miller Engineering Lg Alaska Billboard
- Brand / maker
- Miller Engineering
- Product type
- Model Railroad Accessory
- SKU
- MIE885051
Available to order
Miller Engineering Lg Alaska Billboard is the exact Miller Engineering layout detail, identified by manufacturer part number 885051. The product photo shows the item being offered so you can confirm the scale, finish, and package before...
- Review the listing photos, specifications and condition notes.
Shipping, taxes and any applicable discounts are calculated at checkout.
Description
Miller Engineering Lg Alaska Billboard is the exact Miller Engineering layout detail, identified by manufacturer part number 885051. The product photo shows the item being offered so you can confirm the scale, finish, and package before ordering.
Manufacturer details
In 1914, the government bought the Alaska Northern Railroad and moved its headquarters to "Ship Creek," later called Anchorage . The government began to extend the rail line northward. The Alaska Railroad’s trackage has remained largely unchanged since completion in 1923, and it has never gained a direct outside connection. For much of its early existence, it relied on transporting lumber and other materials within Alaska, or other commodities via ship from the ports at Seward and Anchorage. While these materials remain important commodities for the railroad today, service was greatly expanded with the opening of a railcar barge connection at Whittier in the 1960s. Available in two sizes, large version comes with supports. Limited Edition sign
On the layout
Set it in the scene temporarily first, then adjust the placement until it supports the surrounding track and structures.
Specifications
- Manufacturer: Miller Engineering
- Part number: 885051
- Shipping weight: 115 g
Details
- Brand / maker
- Miller Engineering
- Product type
- Model Railroad Accessory
- Manufacturer part number
- 885051
- SKU
- MIE885051
Match the listed scale and track gauge to your layout. For locomotives, check the power system, decoder and sound details; DCC ready does not mean a decoder is installed. For rolling stock, check couplers, clearance and the manufacturer's minimum-radius requirement where provided.
Shipping
Shipping, taxes and any applicable discounts are calculated at checkout.
Collector reviews
Read product-specific feedback, photos, and buyer experience for this listing.